Projects for NCR Rancho Bernardo, California

As with any origination, you often work in teams and I have had counterparts for the NCR San Diego campus and I worked with them on the below projects including the Campus switch upgrades, this is where we remove a shared media environment and replaced them with Cisco 6000 series switches with proper cable management.

This is a collection of side-by-side images from the NCR Campus Network Upgrade

Please Click on the Images
MDF Before
MDF After
IDF A-1-2 Before
IDF A-1-2 After
IDF A-2-1 Before
IDF A-2-1 After
IDF A-2-2 Before
IDF A-2-2 After
IDF A-3-1 Before
IDF A-3-1 After
IDF A-4-1 Before
IDF A-4-1 After
IDF A-4-2 Before
IDF A-4-2 After
IDF B-1-1 Before
IDF B-1-1 After
IDF B-3-1 Before
IDF B-3-1 After

Site Documentation

Sr. Network Engineer – October 1997 to December 2006: Projects included converting the San Diego campus from shared media to Cisco switched network using 65xx and 45xx Catalyst switches (COS & IOS) for over 5500 ports with Gigabit Uplinks to Core-Routers/Switches. Assisted in deploying of Cisco VoIP along with the replacement of all Cisco switches to a Cisco 6513 with Inline Power (POE) at the San Diego Campus in an ongoing migration from the legacy Avaya PBX to a Cisco VoIP deployment.

Managed Windows NT Domain for San Diego campus with over 50 servers including User, DNS, DHCP, Print services and file services prior to a consolidation to Network Appliance NAC. Migrated over 1400 hosts in San Diego to DHCP and 1200 hosts in Columbia, SC to DHCP then converted again from Microsoft DHCP server to NetID DNS/DHCP solution from Nortel.